Fruit Bowl
Work in
General Practice
.
State
Finished
Clay Body
Speckled
Glaze
Peppermint and creme metal
Timeline
2023.11.04
Work was finished.
2023.10.25
Work was awaiting glaze firing.
2023.10.15
Work was awaiting bisque firing.
2023.10.11
Work was being trimmed.
2023.10.08
Work was thrown.
2023.09.18
Work was recycled.
2023.09.15
Work was being trimmed.
2023.09.09
Work was thrown.